Tolfem Investments Limited


Crude Oil TankerTolfem Investments Limited is a leader in the of Nigerian Bonny Light Crude Oil (BLCO) sales market. As a privately held company, Tolfem Investments Ltd. is committed to and is focused on delivering reliable services to all her clients. Tolfem Investments Limited is determined to continue to grow in the energy sector and to become one of the recognized leaders in the Nigerian oil and gas industry.

Simplifying Nigerian Bonny Light Crude Oil Buying, BLCO

Crude Oil PumpTolfem Investments Ltd has an excellent track record of reliability in the supply of Bonny light crude oil, BLCO. We protect our buyers with 2% Performance Bond while we also expect protection from our customers with bank instrument from the world's top banks. We deliver on TTO, TTT, CIF and FOB basis.

If you wish to purchase Bonny Light Crude Oil from a reliable seller, contact us today to commence a comprehensive purchase procedure.

Crude Oil Tanker

Saturday 10 May 2014

Gazprom Neft selects contractor for Badra oil field

Gazprom Neft, operator of the Badra oilfield development project, has appointed a contractor to lay the pipeline connecting the field to the power station in Zubaidiah, Wasit Province. The tender was won by Pakistani company Techno Engineering Services (Pvt.) Ltd.


In line with the contract, Techno Engineering Services will produce the designs, supply the equipment and materials, and carry out construction of the pipeline. The pipeline - which will be nearly 100-km long and have a daily capacity of 4.4 million cubic meters (circa 1.6 Bcm per year) - is scheduled to begin operations in 2015.


Under Gazprom Neft’s contract with the Iraqi government for the development of the Badra oil field, investors are to be compensated for costs related to infrastructure construction.


Gas supply from the Badra oil field will enhance the Zubaidiah power station’s daily power output and provide a 24-hour power supply to the city of Kut, which currently has electricity supplied for only 16 hours per day. Some of the extracted gas will be used to provide electricity to the Badra oil fields themselves.


In March, Gazprom Neft completed testing on a second well at Badra. The laying and testing of the oil pipeline to the Gharraf oilfield was completed in February, connecting the section to Iraq’s main pipeline system. The construction of the first phase of a central gathering station point with a capacity of 60,000 bpd is nearing completion. Work has also started on a gas treatment plant with the capacity to process 1.5 Bcm per year.